This is common for large land development projects. Top soil (the top 3-6 inches of the ground) is valuable. So before work is done it is scrapped off and stockpiled until the project is over and then redistributed.
This is common for large land development projects. Top soil (the top 3-6 inches of the ground) is valuable. So before work is done it is scrapped off and stockpiled until the project is over and then redistributed.