cristiangherasim
StinGHER
cristiangherasim

Going purely by math, 6.5bn / 11mn = 600$ cost/car. Considering the addition of the Urea system would have initially costed VW around 400$/car I’m figuring the analysts based that estimate on the assumption that they will retrofit Urea systems.