GOT_Dwarf
GOT_Dwarf
GOT_Dwarf

City Water Tunnel No 3 was designed and constructed in sections. The tunnel is designed to criss-cross the other tunnels (No 1. and No. 2) and provide redundancy and reliability (not that it would be noticed by the consumer). Due to the cost, sections were done one at a time. Construction was halted many times due

Jesus Christ what is this comment, people on Jezebel are showing how vile they are, if you actually read the whole letter she states "It has got to be a priority to ensure that more women can access gene testing and lifesaving preventive treatment, whatever their means and background" and "The cost of testing for

Wow. Stunned.