City Water Tunnel No 3 was designed and constructed in sections. The tunnel is designed to criss-cross the other tunnels (No 1. and No. 2) and provide redundancy and reliability (not that it would be noticed by the consumer). Due to the cost, sections were done one at a time. Construction was halted many times due…