I wouldn’t count on being able to build on the existing power. Unless it’s a very small stall count(like 1-2 posts) a gas station/C-store is unlikely to have the spare capacity for a significant DC fast charger install unless it was designed with that in mind. Most installs require a new service to be brought in by…