RE: golf ball & highway - all roads are graded to the side (called cross-slope) to facilitate drainage of water. On a flat stretch, the normal crown is 2% (about 1/4” per foot). For standard 12’ lanes, that’s a drop of about 3”. On curves, the cross-slope gets steeper to assist with handling in the curve and counter…